TIC was awarded the contract for the construction of two new 7,000 TPH batch loadouts and a coal drying and treatment system that is unique in Powder River Basin mining operations.
Technical Details
- Installation of “mass flow” gates in existing silos at each mine
- Inter-connecting conveyor belts
- Transfer buildings and loadout structure equipped with 300 ton surge bins which discharge into 120 ton weigh bins
- 1,140 cy of concrete
- 830 tons of structural steel
- 1,500 lf of 84” and 96” conveyors
- 7,300 lf of 1” to 4” piping
- A fluidized-bed drying system to reduce the coal moisture content from 30 to 10 percent