KENNECOTT CONCENTRATOR MODERNIZATION

KENNECOTT CONCENTRATOR MODERNIZATION - Bingham Canyon, Utah

TIC was the general contractor for the installation of 10.5 miles of underground conveyor, 4.5 miles of above ground conveyor, and underground crusher installation. This was the world’s longest single-flight conveyance system at the time of installation.

Technical Details

  • Three 12,000 hp 34’ x 15’ Dominion SAG Mills
  • Six 5,500 hp 18½‘ x 28’ Marcy Ball Mills
  • One 2,000 hp 14’ x 22’ Rexnord Ball Mill and one 1,000 hp 8’ x 14’ Allis Chalmers Ball Mill
  • 6,000 cy of concrete for an in-pit semi-portable 64” x 109” Allis Chalmers gyratory crusher
  • Seven 1,750 hp and 1,300 hp Byron Jackson vertical turbine pumps installed in two pumphouses.
  • Cooling water and water filtration plant consisting of 3 circulation pumps, a 3 cell 2,500 gpm Baltimore air cooling tower and Eimco filter system
  • 3.2 miles of 72” overland conveyor, most of which was installed in a former railroad tunnel.
  • 95,000 lf of tailings discharge pipelines
  • Tanks, agitators, dryers, Renneburg rotary
Quick Links
Featured Projects
LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.
Contact Kiewit

Home Office : 3555 Farnam St. Omaha, NE

Home Office : (402) 342-2052

General Info : [email protected]

Locations Page   |   Career Search

Featured Projects

LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.

Contact TIC

Home Office :

10055 Trainstation Circle
Lone Tree, Colorado 80124
 

 

Office : 

720-920-4200

 

Jobs Hotline : 

833-281-5273

 

Locations Page   |   Careers