TIC was the general contractor for the construction of grassroots 3,500 tpd gold processing facility. Scope of work included crushing, reclaim and grinding installaions and the autoclave oxidation/carbin-in-pulp process facility
Technical Details
- One 42” jaw crusher
- A 60” x 28’ hydraulic apron-feeder
- A 294’ x 42” belt conveyor in an 11’ x 17’ multi-plate tunnel
- A 1,500hp 22’ x 7’ Kopper SAG Mill
- A 3,000hp 15.5’ x 22’ Kopper Ball Mill
- Three 53’ horizontal/cylindrical autoclaves with 13’ 9 1/2” inside shell dia.
- Autoclave fueled by 300 tpd cyrogenic oxgen plant