TIC was the EPC contractor for the construction of Tenneco’s (Solvay Minerals) Soda Ash Expansion project for Kvaerner Davy (Davy McKee) Corporation.
Technical Details
- Moving all instruments and controls for two (2) calciner and dryer lines from an existing Foxboro 200 system to a new Honeywell TDC 3000 system
- Transferring of 1,800 loops from existing control room without major outages
- Installation of one 14’x6” x 110’ Fuller rotary kiln and one Fuller gas-fired dryer
- 4,800 lf of belt conveyors
- Two (2) 4,500 hp vapor compressors, two ABB ESPs, two crystallizers and two hammer mills/drag conveyors
- 54,000 lf of process pipe
- 17,000 cy of concrete
- 3,628 tons of structural steel