Since entering the market in the early 1980s with gas plant expansions and compressor station work in the Rocky Mountains, we have focused on supporting the dynamic midstream sector. As North America’s oil and gas discoveries have broken records in recent years, we have delivered projects required to bring these resources to market including gas processing plants, compressor and pump stations, pipelines, terminals, and storage tanks.

Tioga Flare Relocation

Tioga Flare Relocation

Tioga, N.D.

TIC was the general contractor for the construction of the Flare Relocation phase to facilitate a future expansion to the Hess Tioga Gas Plant. A new flare system was installed and commissioned to allow for the decommissioning and removal of the existing flare system.

Keystone Oil Pipeline & Pump Stations

Keystone Oil Pipeline & Pump Stations

Through N.D., S.D., Neb., Kan., and Okla.

The TransCanada projects consisted of several crude oil pump stations spread from the Canadian border in eastern North Dakota to the southern border of South Dakota continuing through Nebraska, Kansas, and Oklahoma. The project also utilized fabrication shops that TIC set up in Tower City, N.D., Fargo, N.D., Huron, S.D., and Freeport, Texas. Each station was unique in size and layout.

DCP Mewbourne Gas Processing Plant

DCP Mewbourne Gas Processing Plant

Greeley, Colo.

TIC was the subcontractor on the 100 MMcf/d natural gas processing plant and high-pressure gathering system. Scope of work included foundations, grading, spread rock, retaining walls and underground drains.

Lost Cabin Gas Plant

Lost Cabin Gas Plant

Lost Cabin, Wyo.

TIC was the general subcontractor for the construction of Train 3 for Burlington Resource’s Lost Cabin Gas Plant., a sour gas sweetening facility located in Lost Cabin, Wyo. The plant consists of three (3) trains. The first was designed and constructed by Raytheon Engineers and Constructors. The second and third were both engineered by Washington Group, formerly Raytheon, and constructed by TIC.

Central Gathering Facility

Central Gathering Facility

Yorktown, Texas

Pioneer Project 810001 is a central gathering plant for natural gas and condensate which separates the light natural gas and condensate. It also separates the water and sweetens the gas with an amine unit. The project is currently in operation and sells 12 to 20 tankers of condensate and 17 million cubic feet of natural gas a day.

Quick Links
Featured Projects
LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.
Contact Kiewit

Home Office : 3555 Farnam St. Omaha, NE

Home Office : (402) 342-2052

General Info : info@kiewit.com

Locations Page   |   Career Search

Featured Projects

LA CYGNE GENERATING STATION
LA CYGNE GENERATING STATION
La Cygne, Kan.

Contact TIC

Home Office :

10055 Trainstation Circle
Lone Tree, Colorado 80124
 

 

Office : 

720-920-4200

 

Jobs Hotline : 

833-281-5273

 

Locations Page   |   Careers