TIC-The Industrial Company was the EPC contractor for the design, procurement, construction and startup of the 24 megawatt Steamboat geothermal project.
Technical details:
- Two identical 12 MW (nominal) plants
- Four Rotoflow turbines
- Two Ideal generators rated at 12.5 MW each
- Forty 365 MMBTU Hudson isobutane condenser air coolers
- Six 481 MMBTU Hughes-Anderson brine-isobutane heat exchangers
- Three 2,780 GPM Ingersoll-Rand circulation pumps and one 35,460 gallon Mark Steel isobutane accumulator