TIC – The Industrial Company provides direct-hire construction services to traditional industrial markets across the United States. The same mission the original company had when it began more than 35 years ago. Those markets include power, mining/minerals, oil, gas and chemical, renewable energy, general services and maintenance, substation installations/high voltage testing for the chemical, power and refinery industries and marine/heavy civil and fabrication. TIC provides specialized services through its T. E. Ibberson Company district, whose experience expands over 130 years, specializing in design/build slip form installations and grain handling systems throughout the world.
The Jetty, Marine Mattress and Armor Stone project located in Hilton Head Island, S.C. consisted of the installation of 25,090 square foot of stone-filled marine mattresses and placement of 12,000 tons of armor stone.
The new river walk and dock, located in Savannah, Ga., consisted of demolition of the existing structure, dredging, construction of a temporary ferry maintenance facility and construction of a new 1,580 foot river walk and floating dock.
TIC-The Industrial Company with Kiewit Engineering & Design Co. was the EPC contractor for the 495 megawatt combined-cycle power plant utilizing the nation’s first installed J-series engine.
TIC was the general contractor for the installation of ten LM6000 gas fired turbine generators and all associated Balance of Plant (BOP) equipment and systems.
KCP&L and Westar Energy selected the team of TIC-The Industrial Company, Kiewit and Sargent & Lundy LLC to engineer, procure and construct the retrofit to the 1500 MW plant. The La Cygne Generating Station Environmental Retrofit Project includes the installation of two Hitachi wet FGD scrubbers and new fabric filters on Unit 1 and Unit 2; and a selective catalytic reduction (SCR) system, low-NOx burners and over-fire air system on Unit 2 of the facility.
In a joint venture the TIC - The Industrial Company and Kiewit Power Engineers team was the EPC contractor for a 950 MW combined cycle gas fired power plant.
TIC was the subcontractor on the 100 MMcf/d natural gas processing plant and high-pressure gathering system. Scope of work included foundations, grading, spread rock, retaining walls and underground drains.
TIC was awarded the contract for the complete mechanical installations for Holnam’s Devil Slide Project that included a production line capacity increase from 1,100 STPD to 2,100 STPD of clinker.
TIC was awarded the contract for the construction of two new 7,000 TPH batch loadouts and a coal drying and treatment system that is unique in Powder River Basin mining operations.
TIC was awarded the contract for the installation of a truck wash, conveyors and silo for bulk sulfur.
10055 Trainstation Circle
Lone Tree, Colorado 80124
720-920-4200
833-281-5273