Project Phoenix
Mountain Pass, California
Installed the crusher, paste tails plant, mill and complex piperack that tied the facilities together. Major areas of work involved the primary, secondary and tertiary crushing; stockpiling; conveying; storage; grinding; flotation; filtering and press tails circuit systems. TIC also installed the water treatment system and pre-engineered metal building to support the new ore processing facility. The scope included all associated process piping and valves, along with electrical and mechanical tie-ins.